Orleans Conservation Commission
Work Meeting Nauset Room November 23, 2010
8:30 a.m. Call to Order
Continuation
Last Heard 11/16/2010
Alan & Virginia George 10 Carver Road
by East Cape Engineering, Inc. Assessor’s Map 21, Parcel 77. The proposed removal of a portion of an existing dwelling, construction of an addition, and remodel of an existing dwelling. Work will occur within 100’ of Edge of Wetland.
Last Heard 11/16/2010
Steven & Susan Karp 21 Arey’s Lane
by Ryder & Wilcox, Inc. Assessor’s Map 62, Parcel 57. The proposed renovations to an existing cottage, including emergency removal and replacement of the roof. Work will occur within 100’ of a Coastal Bank, Salt Marsh, and within Land Subject to Coastal Storm Flowage.
Certificates of Compliance
Terri & Fred Clark 14 Pride’s Path
COC request for an Order for the construction of the breezeway, garage addition, and driveway and Septic System alterations. None of the proposed mitigation work was completed. The applicant will re-file for the remaining work to be done under a new Notice of Intent.
James Corley & Sally Everett 152 Namequoit Road
COC request for an Order to construct an addition onto an existing dwelling, construct a detached garage, and gravel driveway construction. A revised plan approved by the Commission on July 28, 2009, shows the reduction in the driveway and includes a planting plan. The Order had been conditioned to include additional plantings for screening and the installation of a groundcover layer if necessary.
Kent & Jean Arnold 23 Meg’s Lane
COC request for an Order to construct a screened-in porch and entryway additions to an existing dwelling, including a proposed planting area. Only one AC pad has been installed, and a stone retaining wall not shown on the approved plan has been built north and west of the addition. The entryway was constructed at 10’x16’ instead of 12’x18’. No As Built has been submitted.
Revised Plan
Andrea Lobkowicz 27 Monument Road
The Order to install an addition and renovations to an existing single family dwelling is proposed to be revised to move the house. The change would result in the moving of the addition 4’ to the east of the original footprint. The deck would move to within 58’ of the wetland, extending the deck approximately 4’ from the existing deck.
Pat & Jim Robert 207 Barley Neck Road
The Order to construct a dwelling, install a septic system & utilities, construction of driveway, grading, landscaping, and removal of invasives and restoration of native plant communities is proposed to be revised. The northerly section of the deck has not be built but instead an outdoor shower put in its place A series of retaining walls have been installed within 100’ of the Top of a Coastal Bank to reduce runoff, and a stone patio has been built adjacent to the deck and within the Limit of Work. A revised Land Management Plan has also been provided to fill in areas left barren from vista pruning.
Richard & Lynn Pell 118 Barley Neck Road
The Order to construct a dwelling, guest house, and swimming pool is proposed to be revised. The swimming pool and patio have been reduced in size and an existing shed will be relocated outside of the buffer zone.
Administrative Reviews
Last Heard 11/16/10
Penni Barnett 64 Tonset Road
Request to prune tree branches 15’ around the house, remove 3 trees, prune 6 trees, and clear a 10’ perimeter around side of the house. Work to be done by S & L Landscaping.
Dawson & Lynn Farber 53 Kenneth Lane
The proposed removal of 2 trees within 100’ of the Top of a Coastal Bank. Trees will be replaced by 2 Eastern Red Cedars, 6-8’ in height. Replacement trees will be placed within vegetation voids along newly constructed revetment at the Top of the Bank to provide screening. Work to be done by Anchor Marine.
Presentation
Sam Sherman would like to speak about his concerns regarding the bulkhead located in front of the Orleans Inn.
Chairman’s Business
Approval of the Minutes from the Work Meeting on November 16, 2010.
Other Member’s Business
Administrator’s Business
Site Visits
Continued from 10/19/2010, 11/16/2010
Robert & Sally Roda (AH1) 187 Namequoit Road
by Coastal Engineering Co, Inc.. The proposed installation of a rock revetment and beach nourishment to a Coastal Bank. Work will occur on a Coastal Bank, Coastal Beach, and within 100’ of the Top of a Coastal Bank.
|